top of page

REAL TRANSFORMATIONS, TRUSTED RESULTS

PROJECTS

From complete overhauls to system upgrades, explore real-world examples of our work and read what clients across the globe say about partnering with DSW Solutions

BEFORE

Captura de pantalla 2025-09-04 035439.png

AFTER

Captura de pantalla 2025-09-04 035446.png
Major Modernisation

Weight: 300kg • Floors: 5 • Brand: Arkel​

Major modernisation of 6 bottom drive traction lifts with IoT remote monitoring. DSW Solutions supplied new doors, bedplates, controllers, machines, safety gear, autodiallers, and overspeed governors.

BEFORE

Captura de pantalla 2025-09-04 035458.png

AFTER

Captura de pantalla 2025-09-04 035505.png
Schindler Smart Upgrade

Weight: 630kg • Floors: 6 •  Brand: Arkel + Schindler​

Installation of a new VF door operator and gearless machine with full UCM compliance. Modernized with IoT-ready Arkel controller, landing door overhaul, and remote monitoring system.

BEFORE

1 news.png

AFTER

1.png

Weight: 300kg• Floors: 5 •  Brand: NEWlift & Sassi

Bottom drive geared modernisation with NEWlift controller. DSW Solutions supplied new doors, bedplate, controller, machine, UCM compliance, autodialler, and overspeed governor.

BEFORE

2a.png

AFTER

2b.png

Weight: 630kg • Floors: 5 •  Brand: Ziehl-Abegg + Wittur

Kone Monospace MRL modernisation with UK controller. DSW Solutions supplied new AMD door operator, Ziehl-Abegg machine & bedplate, controller, UCM compliance, Safeline autodialler, and RegenMaster

BEFORE

3a.png

AFTER

3b.png

Weight: 1275kg • Floors: 2 •  Brand: Kron + Fermator

Irish Rail MRL modernisation. DSW Solutions supplied new Fermator Premium car doors, Kron gearless machine & bedplate, UCM compliance, Pfeifer drako ropes and panel modification.

BEFORE

4a.png

AFTER

4b.png

Weight: 630kg • Floors: 2 •  Brand: Kron + Wittur

Irish Rail MRL modernisation of Orona Arca I. DSW Solutions supplied new Wittur Pegasus anti-vandal car doors, Kron gearless machine & bedplate, UCM compliance, Pfeifer drako ropes and panel modification.

BEFORE

5a.png

AFTER

5b.png

Weight: 630kg • Floors: 6 •  Brand: Kron + Wittur

Custom made gearless machine to replace existing IMEM Xinda solution. DSW Solutions supplied new car door operator, Kron gearless machine & bedplate, UCM compliance and Pfeifer drako ropes.

BEFORE

6a.jpg

AFTER

6b.JPG

Weight: 1000kg • Floors: 2 •  Brand: Arkel + Wittur

Gearless MRL modernisation to replace existing IMEM Xinda solution. DSW Solutions supplied this UK supermarket chain with a new Wittur Pegasus doors, Arkel Controller and Safeline autodialler.

BEFORE

7a.JPG

AFTER

7b.JPG

Weight: 630kg • Floors: 4 •  Brand: Arkel + Wittur

Schindler Eurolift modernisation. DSW Solutions supplied a new gearless machine with UCM compliance, Wittur Pegasus doors, Arkel Controller and Safeline autodialler.

BEFORE

8a.JPG

AFTER

8b.JPG

Weight: 750kg • Floors: 9 •  Brand: Arkel, Sassi + Wittur

Bottom drive geared modernisation. DSW Solutions supplied a new geared machine, new safety gear and OSG, Wittur car door operator, Arkel Controller, IoT remote monitoring and Safeline autodialler.

BEFORE

9a.JPG

AFTER

9b.JPG

Weight: 630kg • Floors: 9 •  Brand: Arkel, Sassi + Wittur

Bottom drive geared modernisation. DSW Solutions supplied a new geared machine, new safety gear and OSG, Wittur car door operator, Arkel Controller, IoT remote monitoring and Safeline autodialler.

BEFORE

0b30c6a1-4157-4cbf-af31-c6147b53e86d.JPG

AFTER

PHOTO-2025-04-17-15-37-36.jpg

Weight: 630kg • Floors: 5 •  Brand: Arkel + Wittur

Emergency control panel repair. DSW Solutions supplied a Wittur car door operator, Arkel Controller, IoT remote monitoring and Safeline autodialler.

BEFORE

Before.JPG

AFTER

After.JPG

Weight: 630kg • Floors: 18 •  Brand: Arkel + Ziehl-Abegg

Duplex top drive geared to gearless. DSW Solutions supplied Ziehl-Abegg gearless machines, Arkel Controller and IoT remote monitoring.

BEFORE

IMEM Silens Pro Revolution before.jpg

AFTER

IMEM Silens Pro Revolution_after.jpg

Weight: 630kg • Floors: 2 •  Brand: Carlos Silva & Wittur

IMEM Silens Pro Revolution modernisation with electromechanical Wittur ESG safety gear. Limax and SIL3 compliance.

BEFORE

Before 1 DSW Solutions Hydraulic Lift Modernisation.JPG

AFTER

After 1 DSW Solutions Hydraulic Lift Modernisation Algi.JPG

Weight: 1500kg • Floors: 2 •  Brand: Algi VF hydraulics & Arkel Controller

London modernisation including new controller, door operator, ALGI VF hydraulics and 3phase UPS evacuation.

BEFORE

Before Hydrax Hydraulic Lift DSW Controller Modernisation.png

AFTER

DSW Solutions Hydraulic Lift Modernisation.JPG

Weight: 675kg • Floors: 3 •  Brand: Arkel Controller & Safeline Evacuation

London modernisation including new Arkel controller, Safeline EVAC autodialler and 3phase UPS evacuation.

BEFORE

Schindler Smart Modernisation before DSW

AFTER

Schindler Smart Modernisation DSW Solutions.JPG

Weight: 630Kg • Floors: 2 •  Brand: Arkel Controller, Kron & Safeline

London modernisation including new Arkel controller, Safeline autodialler, remote monitoring IoT and Kron Schindler Smart machine.

freepik__vertical-interior-view-of-a-highend-elevator-cabin__62646.png

WHAT OUR CLIENTS ARE SAYING

“DSW helped us modernise 12 lifts in record time, fully compliant and delivered on time.”

Facility Manager
Madrid

“Their technical support is unmatched. Clear, fast and always available when we needed it.”

Installer
United Kingdom

“With DSW’s energy solutions, we cut our building’s elevator power costs by 42%.”

Building Owner
Oslo
bottom of page